


|
sponsored by Square D Critical Power Competency Center
|
|
|
Posted:
|
12 Feb 2009
|
|
Published:
|
12 Feb 2009
|
|
Format:
|
PDF
|
|
Length:
|
11
Page(s)
|
|
Type:
|
White Paper
|
|
Language:
|
English
|
|
|
ABSTRACT:
In order for the electrical power distribution systems within data centers and related facilities to operate properly as designed and intended, it is extremely important that care be given to the commissioning and startup of the electrical equipment via effective and reliable methods. This paper describes the need for a systematized program for new power equipment startup and the best practices and pitfalls that exist with regards to power equipment startup. This paper will also provide an overview of important items and issues that should be focused upon as part of reliable power equipment start up procedures and processes.
|
|
|
Author
Frank Waterer
Square D Engineering Services
|
 |
BROWSE RELATED
RESOURCES
Best Practices | Data Center Management | Data Centers | Electronic Components | Electronics Equipment | Fault Management | Power Generation Equipment | Power Supplies | Power Test Equipment | UPS
|
View All Resources
sponsored by Square D Critical Power Competency Center
|
|
BusinessWeek Technology Research Library Copyright © 1998-2009 Bitpipe, Inc. All Rights Reserved. Designated trademarks and brands are the property of their respective owners. TechTarget · 117 Kendrick St · Needham, MA · 02494
Use of this web site constitutes acceptance of the Bitpipe Terms and Conditions and Privacy Policy. businessweek@bitpipe.com
|